Beaverton kitchens have great bones — most of them are just stuck in a previous decade. K&H Construction & Remodeling turns closed-off galley kitchens and dated oak-and-laminate layouts into bright, open spaces built for how families cook today. We’re a licensed, family-run crew serving Beaverton from just over the hill in Portland.
What We Do for Beaverton Kitchens
A huge share of Beaverton’s housing stock — the ranches and split-levels of Cedar Hills, Raleigh Hills, and Garden Home, and the 80s–90s two-stories around Sexton Mountain and Murray Hill — was built with the kitchen walled off from the living space. Our most-requested Beaverton projects:
- ✓ Opening the kitchen to the living area — removing or partially opening walls (with proper structural work and permits)
- ✓ Full cabinet and countertop replacement — semi-custom or custom, quartz and granite surfaces
- ✓ Islands with seating — the upgrade that changes how the whole main floor works
- ✓ Lighting and electrical updates — from single ceiling fixtures to layered task lighting, done to code
- ✓ Flooring that flows — continuous hardwood or LVP through kitchen and living spaces
A Local Crew That Handles Everything
Free Consultation
We visit your Beaverton home, measure, and talk through goals and budget.
Design & Selections
Cabinets, counters, and lighting chosen so the pricing is real.
Itemized Estimate
Line-item pricing — cabinets, counters, labor, permits, timeline — in writing.
Permits
Filed with the City of Beaverton (or Washington County) and inspected. Typical kitchen: approved in 1–2 weeks; moving walls or changing structure: 3–4.
Build
One dedicated crew, clean job sites, and steady communication.
Walkthrough
We’re done when you love your kitchen.
Get a straight answer on your Beaverton kitchen.
Free consultation and itemized estimate — response within one business day.
Beaverton Kitchen Remodeling FAQ
Do you handle Beaverton building permits?
Yes. Kitchen projects involving plumbing, electrical, or structural changes need permits from the City of Beaverton (or Washington County, depending on your address) — we manage the process and inspections as part of the project.
Which Beaverton neighborhoods do you serve?
All of them — Cedar Hills, Raleigh Hills, Garden Home, West Slope, Sexton Mountain, Murray Hill, Five Oaks, Progress Ridge, and everywhere in between.
How long does a Beaverton kitchen remodel take?
A cabinet-and-counter refresh typically runs 2–3 weeks; a full remodel with layout changes usually 6–10 weeks including permits. You get a realistic timeline in your estimate.
Can you match the rest of our home’s style?
That’s the goal — we design the kitchen to fit your house, not a showroom. Flooring, trim, and paint transitions are part of the plan so the finished kitchen looks like it was always meant to be there.
Explore our full kitchen remodeling services, browse completed projects, visit nearby kitchen remodeling in Lake Oswego, see bathroom remodeling in Beaverton, or call (971) 220-6397 to get started.
Guides for your project
TimelinesHow Long Does a Kitchen Remodel Take?most full kitchen remodels we build take 4–8 weeks of construction, and that's the stretch you're without a working kitchen. A refresh that keeps the layout takes 2–3…Read the guide →
ComparisonsKeep Your Kitchen Layout or Change It?keep the layout when the room already works and the problems are finishes, storage, or light. That's faster and simpler, and it keeps you in a lower budget range. Chan…Read the guide →
ChecklistsKitchen Remodel Checklist: What to Decide Before You Call a Contractorbefore you call a contractor, decide what's wrong with the kitchen you have, what you must keep, a budget range you're comfortable with, and whether the layout stays o…Read the guide →