Happy Valley homes are young — but builder-grade bathrooms age fast. Most of the housing here went up from the 1990s on, and the bathrooms got what builders always install: acrylic surrounds, cultured-marble counters, oak-framed mirrors. K&H Construction & Remodeling replaces builder-grade with built-for-you — tile showers, real stone, and primary suites that match what these homes are worth.
What Happy Valley Homeowners Ask Us For
- ✓ Primary-suite bathroom upgrades — replacing the builder’s garden tub + acrylic shower combo with a large tiled walk-in shower
- ✓ Double-vanity rebuilds — custom cabinetry and quartz in place of cultured marble
- ✓ Tile that makes the room — floor-to-ceiling showers, heated floors, statement niches
- ✓ Hall and kids’ bath refreshes — durable finishes that survive the household
- ✓ Lighting & ventilation done right — layered light and properly-ducted fans
Why Neighbors Choose K&H
- ✓ Licensed, bonded & insured — Oregon CCB #233813 (verify)
- ✓ 5-star Google rating from Portland-metro homeowners
- ✓ Waterproofing to manufacturer spec — membranes and pans done by the book, not by habit
- ✓ Itemized estimates — fixtures, tile, labor, and timeline in writing before work starts
How It Works
Free Consultation
We visit your Happy Valley home, measure, and talk through goals and budget.
Design & Selections
Tile, fixtures, and layout chosen before anything is priced.
Itemized Estimate
An itemized estimate with selections, scope, and a real timeline.
Permits
Filed with Clackamas County (Happy Valley’s building authority) and inspected. Most bathrooms (plumbing and electrical): approved in 1–2 weeks; moving walls or changing structure: 3–4.
Build
Demo, waterproofing, tile, and finish — one dedicated crew.
Walkthrough
Punch list done. We’re finished when you love it.
Upgrade the bathroom your house deserved from day one.
Free consultation and itemized estimate — response within one business day.
Happy Valley Bathroom FAQ
Do you handle permits in Happy Valley?
Yes — bathroom remodels involving plumbing or electrical work are permitted through the City of Happy Valley / Clackamas County, and we manage the process and inspections as part of your project.
How long does a bathroom remodel take?
A straightforward update runs 2–3 weeks; a full primary-suite remodel typically 4–6 weeks depending on tile scope and fixture lead times. You get a realistic schedule up front.
Which areas around Happy Valley do you serve?
All of Happy Valley plus neighboring Clackamas, Damascus, Pleasant Valley, and Milwaukie — and the whole Portland metro.
Planning more than a bathroom? See our Portland bathroom remodeling hub, kitchen remodeling, or call (971) 220-6397.
Guides for your project
TimelinesHow Long Does a Bathroom Remodel Take?most bathroom remodels we build take 2–3 weeks of construction for a same-layout update and 4–6 weeks for a full gut. A custom tiled tub-to-shower conversion takes one…Read the guide →
ChecklistsBathroom Remodel Checklist: What to Decide Before You Call a Contractorbefore you call a contractor, decide what isn't working in the bathroom, whether the tub stays, whether the toilet, sink, and shower stay where they are, and a budget…Read the guide →
ComparisonsShower Wall Panels vs Custom Tile: Which Lasts in a Portland Bathroom?panels go up faster, cost less, and have few or no grout lines, but they come in limited styles and depend on seams and caulk to keep water out. Custom tile costs more…Read the guide →